| Day 1 |
| Turn the power on at breaker box |
| pull the plugs from the skimmers |
| Put water in all the pumps |
| Get the serials numbers |
| Start the equipment up |
| Put DE in the skimmer |
| Test the chemical level |
| Add chemicals that are needed: |
| (Including) |
| Calicum Chloride |
| Acid |
| Calicum hydrocloride |
| stabilizer |
| bi-carb |
| add necessary amounts chemicals |
| Put sequest in the water one bottle per 10,000 gallons |
| Brush the pool down |
| Brush vac the pool |
| Label the equipment |
| Put all start up equipment on the job |
| Point returns in pool |
| Leave the pool running in |
| Call Keith about any problems |
| Notes |
|
| Day 2 |
| Test the chemicals |
| add neccesary (Chemicals) |
| Acid |
| stabilizer |
| bi-carb |
| Calicum chloride |
| Calicum hydrocloride |
| Brush pool |
| Brush vac |
|
|
| Day 3 |
| Test the chemicals |
| add neccesary (Chemicals) |
| Acid |
| Stabilizer |
| Calicum Chloride |
| Calicum Hydrocloride |
| Brush pool |
| Brush vac pool |
| Backwash |
|
|
| Day 4 |
| Test the chemicals |
| Add neccesary (Chemicals) |
| Acid |
| Stabilizer |
| Calicum Chloride |
| Calicum hydrocloride |
| Brush Pool |
| Brush Vac Pool |
|
|
| Day 5 |
| Test the Chemicals |
| add necessary (Chemicals) |
| Acid |
| stabilizer |
| Calicum Chloride |
| Calicum hydrocloride |
| Brush Pool |
| Brush Vac Pool |
|
Pool school will be scheduled with The Pool Surgeon after the chemical start up is done. This is a process that teaches the new pool owner about how to use there pool. Monthly pool service is available and is provides by Perpetual Pool Care. |
|
28 days later add the salt The filter should be cleaned within sixty days of the start up process The Pool Surgeon is who we recommend cleans your filter. |